3D Storytelling 2012

3D Storytelling is one of the biggest events of the year at Ravensbourne. The event is totally different from any other that is run within Ravensbourne as it is headed up by the events team and is run by a select group of students. This year Russell Fleming and Myself took on all of the events logistics and rigging with Tom Glover creating the lighting design. The event features around the fact that there is a RealD Projector in the walker space that allows speakers from different companies to show off there work to the rest of the 3D television and film industry. This gives the students a platform to network with people form within industry as nearly 1000 delegates turn up across the 2 day event.

 

My role for 3D storytelling was as head of rigging and logistics, Russell was head of event technology and logistics, both of us have these roles for Ravensbourne 2012. The main rigging requirements for this event were to light the walker space for the keynote speeches, light the building to give it a different look and feel and put power distribution on the 4th floor for the exhibition.

To start with I worked out the power requirements for the exhibition going off a floor plan with 22 stalls on it. This time I decided to use the 125 Amp 3Phase on level 5 and split it down to 2 63 Amp 3Phase’s as we had some high power lights for the architectural lighting. The distro’s that we went with were 125A 3P to 2 x 63A 3P and 2 x 63A 3P to 18 x 16A. This meant that I had more than enough outputs for all of the lighting requirements and if all of the stalls were used. We also made the decision to cut the 4 way extensions down to 2 as it was felt that they only need 2 sockets per stall.

 

For the lighting side of the rigging Tom had asked for 4 city colour washes to go on level 7 and 4 to go on level 4 along with 2 Clay Paky 1200 spots to go at each location. The Clay Paky’s on level 7 had to be hung to get good coverage on the wall. Originally I wanted to hang them off a truss rigged to the RSJ’s above level 9 but as we did not have a load testing certificate to say what load they could take health and safety did not like the idea. I then decided to put them on 2 wind up stands on the 7th floor. The lighting for the main atrium was originally going to go on the 4th floor but was deemed to be in the fire lane and had to be moved when once it had been put in place. We had to move it to the 1st floor/Mezz which actually created some nicer angles and gave a really nice look on the final night when the networking was taking place in the welcome space. All of these lights were sitting on 3ft high deck so that the metal grill under the railing did not get in the way.

 

In the walker space we felt that we had to do something different from what had been done before in that space. We ended up dead hanging a scaff bar and putting par cans up for a wash of colour along with source 4’s with gobo break ups in them, for once no movers were used. This all ran of the house dimmer pack saving a lot of money and time.

 

The biggest challenge that Russell and myself had in the planning stage of this event was where to put a Telegenic OB truck. This is a major problem as the outside of Ravensbourne is not designed to have a truck of this size sitting there for over 2 days. This caused major problems right up until the last minute as every location that we chose there was something causing a problem. In the end we got parked it down the side of Rave. I feel proud at the amount of contacts that Russell and myself made out of this event, some of which involved people that generally students don’t even know about. I also made sure that I did not make the same mistakes that I made at penrose market. The logistics generally ran very smoothly with no major problems. This is due to the time and care that Russell and myself put in and the communication with the management of the event. I have to give a big thank you to the second rigging team as they managed to gel over 250 florescent lights around Rave to change the colour of the building.

Stickaid 2011

0
Stickaid2011

Stickaid2011

This weekend has been a very long yet fun weekend working on Stickaid 2011 with SilverLine Media, at Ravensbourne University, North Greenwich. Stickaid is a 24 hour broadcast streamed live onto Stickam.com and Youtube.com and this year it came from Ravensbourne, with the help of SilverLine providing the stream and many Ravensbourne students filling rolls from Camera Operators to Sound Supervisors to Editing and many more. The students that helped out over the weekend came from all year groups with some only 3 day’s into there courses.

Scott and Russell from Fluxity were originally brought in on Thursday and Friday to rig the events lighting and power. This job turned out to be over complicated due to some poor planning and communication from all parties involved. The rig should have taken only 8-10hours to complete but had to be completely re-worked to overcome the lack of correct power and distribution.

At 5pm on Friday afternoon Tom also joined the frustrated rigging team to assist in finalising some decisions and to get the rig moving again. The rig was finally completed at approximately 11.45pm on the Friday, with only a quick focus and program to be completed in the two hours before the 12Midday Broadcast start. Programming was completed during the first couple of hours of broadcast by Charlie Fox and Scott.

Fluxity Lighting was kept on call during the event for power and other related problems, and we are very pleased to report that we didn’t receive a single call, and the system was stable and survived the full 24hours.

Scott, Tom and Russell turned up at about 11am on Sunday for the De-rig that was due to begin at about 12.15pm. Between the three of us we had all of the lighting power and staging out of the rig and Ravensbourne back to how it was, in just under 6 hours, in a very relaxed yet steady de-rig.

All in all a long weekend in which we helped raise over £17000 for Unicef. It’s not too late to Donate still, just click on the logo above.

Here’s what Elliot from SilverLine Media had to say about working with Fluxity, over this last weekend:

Scott, Russell and in the end Tom, helped us Thursday, Friday and when I honestly thought that we weren’t going to have the lights going or anything, 2 hrs before TX they made it all happen.  Thank you so much guys, especially for dealing so well with my screw ups and then the de-rig on Sunday!

RITA: Rave In The Afternoon

0

Today’s the day, when we worked closely with the operation students to produce their first TV show, and to give us all a chance to practice the skills we picked up on the Circus.

Today I was originally just the lighting assistant, but in the end with my previous lighting experience, I took over as the lighting director, coming up with the design, and assisting with the rigging.

This morning we got the bulk of the design rigged with in 40 mins of arrival, but after that, we struggled with a few flown lanterns and  dimmer channels. the dimmer channels were a major issue as they didn’t allow me to have lights where I required them.

These little issues pushed us slightly behind schedule, but we’ve learnt from them, and now know faster ways to rig in the studio, and other little niggles that are present.